Sunday, June 2, 2019

Engineering Requirements and Available Engineering Capacity :: Engineering PreQuip Technology Essays

Engineering Requirements and Available Engineering dexterityWhat Explains the Relationship Between Engineering Requirements and Available Engineering. 1. WHAT EXPLAINS THE kind BETWEEN ENGINEERING REQUIREMENTS AND AVAILABLE ENGINEERING CAPACITY AT PREQUIP?WHAT ARE THE IMPLICATIONS OF THE PATTERNS IN THE EXHIBIT?The patterns between the Engineering Requirement and the AvailableEngineering Capacity are such that long-term run acrosss such as Project4 which requires 286 Engineering Months are being stretched throughoutseveral years instead of end it and allocating the resourceselsewhere. Due to the limited duration available, time should be spentcompleting as much as Project 4 as possible instead of delaying untilthe second year and finalising it in another. If the Project wascompleted in two years then the resources would be available for otherprojects in the third. Along with minify the number of Projects thatare active at any one time, the company would be in a better positi onto deal with the Projects that need completing.The implications of the patterns refer thelarge problem of over committing. The company has too few resources tocope with the large active list. These implications ensure thatPreQuip are always assigning inaccurate levels of resources toprojects which over time will prevent them from completing anyproject. Loss of business may follow and the company would in the endcollapse do their incompetence to effective project planning.2. WHAT IS A PLATFORM PROJECT? HOW DOES IT DIFFER FROM A BREAKTHROUGH PROJECT? WHAT SPECIFIC CRITERIA WOULD YOU RECOMMEND THAT COMPANIES ESTABLISH TO DEFINE PLATFORM AND BREAKTHROUGH PROJECTS?A computer program project is a project set up to provide the company with aplatform from which new products and processes can be developed. Thisproposed development is designed to utility the company over a setperiod of time with the aim to release new profitable products.Platform projects, if designed correctly, can provide legion(predicate) add-onsand enhancements to this new products extending the product life cycle still by potentially being able to reach into new and untappedmarkets, thus extending the profitability further too.An example of this would be the development of The Sims computergame. The game and the idea behind the game has evolved and hasenabled the developers to turn a non-profitable game using obsoletetechnology into the most sold computer game to date. The developmentof the artificial intelligence required to bring realism, creativityand graphic design has been included into more and more versionseventually leading to the introduction of The Sims games where youcontrol all aspects of the characters lives. New developments havebeen introduced to meet the artificial lives that are being controlled

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.